A clear path from first conversation to installation.
Our process is designed to support thoughtful design, precise fabrication and predictable outcomes. From the first inquiry through final installation, our team maintains clarity, alignment and consistency with the client at every stage.


Overall Project Timeline
Typical range: 16–24+ weeks from proposal approval to installation.
Final schedules are confirmed once scope, drawings and site conditions are fully coordinated.
01 Inquiry
ESTIMATED TIMEFRAME: 1–2 WEEKS
We start by gathering essential project information: scope, timeline and performance requirements. This conversation establishes direction and confirms alignment with the architectural intent and technical needs of the project. Drawings, reference imagery and preliminary specs are welcome at this stage.
02 Proposal
ESTIMATED TIMEFRAME: 1–2 WEEKS
Based on the initial review, we prepare a detailed proposal covering collection selection, scope and pricing. This step confirms design direction and gives all parties a chance to align before detailed documentation begins. Once approved, the project moves into design development.
03 Design and Shop Drawings
ESTIMATED TIMEFRAME: 3–5 WEEKS
Our design and engineering team develops comprehensive shop drawings for review and approval. These address dimensions, profiles, glazing, finishes and coordination with adjacent assemblies. Review cycles and approvals are built into this phase to ensure alignment across the design team, builder and installer before fabrication starts.
04 Fabrication
ESTIMATED TIMEFRAME: 10–14 WEEKS
Fabrication takes place in our Los Angeles facility. Each component is cut, welded and assembled with close attention to tolerance and alignment. Lead time depends on system configuration, quantity and finish selection.
05 Finishing and Glazing
ESTIMATED TIMEFRAME: 2–4 WEEKS
Frames are finished to the specified tier, then glazed and fitted with hardware. Each assembly is inspected for quality, consistency and performance before delivery.
06 Installation
ESTIMATED TIMEFRAME: 1–3 WEEKS, SITE-DEPENDENT
We coordinate directly with the builder or installer to support delivery, fit and final alignment on site. Our team stays available throughout installation and commissioning to provide technical guidance and ensure the work performs as intended. Duration varies based on project scale, site readiness and sequencing with other trades.